What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £435.03 |
| 2 | BREDBURY | £416.22 |
| 3 | Skelmersdale | £365.57 |
| 4 | Ilmer Lane | £336.16 |
| 5 | Chapel Farm | £336.16 |
| 6 | Pivot Coventry | £299.40 |
| 7 | Limejump Energy #01 | £288.50 |
| Region | £/MWh |
|---|---|
| Eastern | £336.2 |
| North Western | £328.2 |
| Midlands | £279.0 |
| Yorkshire | £269.7 |
| Southern | £246.2 |