What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Great Yarmouth | £13.33 |
| 2 | THURROCK STORAGE #3 | £9.16 |
| 3 | Didcot B main 6 | £8.00 |
| 4 | Dong Severn Ut 10 | £7.00 |
| 5 | Exergy Solutions E00E | £6.94 |
| 6 | Lakeside | £5.95 |
| 7 | SUNDON | £5.18 |