What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 40 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £12.80 |
| 2 | SSE Energy Supply #01 | £12.75 |
| 3 | SOUTH HUMBER BANK P/S | £12.48 |
| 4 | Immingham CHP | £11.80 |
| 5 | Brigg | £10.00 |
| 6 | Dong Severn Ut 20 | £9.99 |
| 7 | Sizing John | £9.64 |
| Region | £/MWh |
|---|---|
| Yorkshire | £10.0 |
| Eastern | £9.6 |
| South Eastern | £8.3 |