What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Keadby-2 Main | £13.92 |
| 2 | SOUTH HUMBER BANK P/S | £13.54 |
| 3 | Shoreham | £13.36 |
| 4 | SSE Energy Supply #01 | £12.62 |
| 5 | Dong Severn Ut 20 | £10.58 |
| 6 | Hunningley Stairfoot | £10.23 |
| 7 | Unit 3 | £10.12 |
| Region | £/MWh |
|---|---|
| Yorkshire | £10.2 |
| Merseyside and North Wales | £9.9 |
| Eastern | £9.4 |