What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Dong Severn Ut 20 | £13.74 |
| 2 | Unit 3 | £11.37 |
| 3 | Spalding | £10.75 |
| 4 | Centrica Business Solutions S05L | £10.15 |
| 5 | Swangate | £9.52 |
| 6 | Brigg | £8.96 |
| 7 | Sizing John | £8.72 |
| Region | £/MWh |
|---|---|
| Eastern | £8.7 |
| Merseyside and North Wales | £8.2 |
| Yorkshire | £8.0 |
| Southern | £7.5 |
| Northern | £6.8 |