What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £49.00 |
| 2 | Pivot Kemsley | £48.00 |
| 3 | Nursling | £48.00 |
| 4 | Tye Lane | £47.93 |
| 5 | Cowley | £47.78 |
| 6 | SUNDON | £47.76 |
| 7 | Zenobe Capenhurst #1 | £47.50 |
| Region | £/MWh |
|---|---|
| Southern | £48.0 |
| Eastern | £47.9 |
| Merseyside and North Wales | £47.5 |
| South Western | £47.4 |
| Midlands | £44.1 |
| South Eastern | £25.3 |
| Yorkshire | £21.7 |