What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 14 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £68.45 |
| 2 | Nursling | £67.65 |
| 3 | ClayTye Farm 1 | £67.44 |
| 4 | Zenobe Capenhurst #4 | £66.36 |
| 5 | Pillswood 1 | £64.05 |
| 6 | Lakeside | £63.25 |
| 7 | Pillswood 2 | £63.04 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £66.4 |
| Yorkshire | £63.4 |
| Southern | £62.9 |
| South Wales | £62.4 |
| Eastern | £61.9 |
| South Eastern | £61.0 |
| Northern | £58.2 |