What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 26 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £93.50 |
| 2 | Cowley | £91.68 |
| 3 | EDFE Aggregate S Eng 02 | £91.65 |
| 4 | SUNDON | £91.57 |
| 5 | Zenobe Capenhurst #3 | £91.00 |
| 6 | BESS Holdco 2 EN7H | £90.50 |
| 7 | ClayTye Farm 1 | £87.47 |
| Region | £/MWh |
|---|---|
| Southern | £90.5 |
| Eastern | £85.0 |
| Midlands | £76.4 |
| Yorkshire | £75.4 |
| South Eastern | £64.7 |
| Merseyside and North Wales | £58.0 |
| South Western | £46.9 |
| South Wales | £46.5 |
| Northern | £39.7 |