What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 24 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £27.72 |
| 2 | EDFE Aggregate N Scot 1 | £19.82 |
| 3 | Jamesfield 2 | £16.62 |
| 4 | Little Raith | £16.62 |
| 5 | GridBeyond L0DN | £16.26 |
| 6 | Pillswood 1 | £14.78 |
| 7 | Tye Lane | £14.26 |
| Region | £/MWh |
|---|---|
| North Scotland | £16.6 |
| South Scotland | £16.6 |
| Eastern | £14.3 |
| Yorkshire | £14.1 |
| Southern | £14.1 |
| North Western | £14.0 |