What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | UKPR S East | £17.68 |
| 2 | UKPR MANW | £17.12 |
| 3 | UKPR East Mids | £16.90 |
| 4 | Lakeside | £16.50 |
| 5 | Broadditch | £16.40 |
| 6 | Ocker Hill | £15.57 |
| 7 | Dinorwig | £13.55 |
| Region | £/MWh |
|---|---|
| Yorkshire | £11.3 |
| Midlands | £10.7 |
| South Eastern | £10.0 |
| North Western | £9.1 |
| Southern | £8.7 |
| South Wales | £8.6 |
| Eastern | £7.8 |
| Northern | £3.5 |