What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 20 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ClayTye Farm 2 | £58.80 |
| 2 | Sizing John | £58.33 |
| 3 | Pen y Cymoedd | £57.69 |
| 4 | EDF Energy F01C | £57.00 |
| 5 | Cowley | £56.50 |
| 6 | Nursling | £55.88 |
| 7 | Zenobe Capenhurst #2 | £55.00 |
| Region | £/MWh |
|---|---|
| South Wales | £57.7 |
| Merseyside and North Wales | £54.7 |
| Southern | £54.2 |
| Eastern | £52.1 |
| South Eastern | £44.6 |
| Yorkshire | £43.7 |
| North Western | £43.2 |
| Midlands | £42.7 |
| Northern | £36.9 |