What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 50 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Thame Road | £25.36 |
| 2 | EDF Energy F01C | £25.00 |
| 3 | Holes Bay | £24.86 |
| 4 | SUNDON | £24.55 |
| 5 | EDFE Aggregate S Eng 02 | £24.54 |
| 6 | Zenobe Capenhurst #2 | £24.39 |
| 7 | Chapel Farm | £24.26 |
| Region | £/MWh |
|---|---|
| Southern | £24.4 |
| Eastern | £23.4 |
| Merseyside and North Wales | £21.7 |
| Yorkshire | £18.9 |
| Midlands | £18.8 |
| North Western | £17.0 |
| South Eastern | £16.6 |
| South Wales | £16.2 |
| Northern | £10.0 |