What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Native River | £69.20 |
| 2 | Sizing John | £68.37 |
| 3 | Pen y Cymoedd | £68.36 |
| 4 | EDF Energy F01C | £66.55 |
| 5 | ClayTye Farm 1 | £65.81 |
| 6 | Wormald Green | £62.73 |
| 7 | Holes Bay | £61.47 |
| Region | £/MWh |
|---|---|
| South Western | £69.2 |
| South Wales | £68.4 |
| Eastern | £66.3 |
| Northern | £62.7 |
| Merseyside and North Wales | £60.0 |
| Southern | £59.8 |
| South Eastern | £54.4 |
| Midlands | £47.9 |
| Yorkshire | £27.2 |
| North Western | £27.0 |