What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 8 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Flexitricity #01 | £7.00 |
| 2 | SOUTH HUMBER BANK P/S | £6.13 |
| 3 | Roosecote | £5.00 |
| 4 | Brigg | £4.99 |
| 5 | West Burton B 3 | £3.87 |
| 6 | Carrington Ltd - 2 | £3.58 |
| 7 | HawkersHill | £3.31 |
| Region | £/MWh |
|---|---|
| North Western | £5.0 |
| Yorkshire | £5.0 |
| Southern | £3.3 |
| South Eastern | £2.6 |
| Eastern | £2.4 |