What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 28 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Native River | £68.41 |
| 2 | Sizing John | £68.34 |
| 3 | EDF Energy F01C | £65.83 |
| 4 | Tye Lane | £64.72 |
| 5 | EDFE Aggregate S Eng 02 | £64.57 |
| 6 | Cowley | £64.56 |
| 7 | BESS Holdco 2 N03J | £64.44 |
| Region | £/MWh |
|---|---|
| South Western | £68.0 |
| Eastern | £65.0 |
| Midlands | £61.9 |
| Merseyside and North Wales | £61.1 |
| Southern | £46.3 |
| North Western | £43.4 |
| South Eastern | £27.0 |
| Yorkshire | £23.8 |
| Northern | £16.0 |