What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 37 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Tye Lane | £38.87 |
| 2 | Native River | £38.50 |
| 3 | Pivot Kemsley | £38.40 |
| 4 | EDF Energy F01C | £38.20 |
| 5 | Nursling | £37.87 |
| 6 | Cowley | £37.65 |
| 7 | Zenobe Capenhurst #4 | £36.88 |
| Region | £/MWh |
|---|---|
| South Western | £37.1 |
| Merseyside and North Wales | £36.8 |
| Northern | £32.5 |
| Midlands | £32.4 |
| Southern | £29.5 |
| Eastern | £27.2 |
| South Eastern | £27.0 |
| Yorkshire | £24.4 |
| North Western | £21.9 |
| South Wales | £18.8 |