What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £1.52 |
| 2 | EDFE Aggregate S Eng 02 | £1.26 |
| 3 | Pillswood 2 | £1.17 |
| 4 | Cowley | £1.14 |
| 5 | BESS Holdco 2 N02A | £1.08 |
| 6 | SUNDON | £1.08 |
| 7 | Larks Green | £1.03 |
| Region | £/MWh |
|---|---|
| Yorkshire | £1.2 |
| South Eastern | £1.1 |
| Eastern | £1.1 |
| South Western | £1.0 |
| Merseyside and North Wales | £1.0 |
| Southern | £1.0 |
| Northern | £1.0 |