What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Sizing John | £86.58 |
| 2 | Native River | £86.57 |
| 3 | Tye Lane | £75.24 |
| 4 | Nursling | £75.00 |
| 5 | EDFE Aggregate S Eng 02 | £74.83 |
| 6 | Cowley | £74.77 |
| 7 | SUNDON | £74.67 |
| Region | £/MWh |
|---|---|
| South Western | £86.6 |
| Eastern | £76.2 |
| Southern | £75.0 |
| North Western | £66.0 |
| Midlands | £59.1 |
| Northern | £51.1 |
| Yorkshire | £34.3 |
| South Wales | £13.3 |
| South Eastern | £12.8 |