What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 31 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ClayTye Farm 1 | £54.62 |
| 2 | Contego | £54.20 |
| 3 | Thame Road | £53.91 |
| 4 | Cowley | £50.25 |
| 5 | EDFE Aggregate S Eng 02 | £48.46 |
| 6 | SUNDON | £48.39 |
| 7 | Pen y Cymoedd | £37.33 |
| Region | £/MWh |
|---|---|
| Eastern | £53.1 |
| South Wales | £37.3 |
| South Eastern | £31.7 |
| Yorkshire | £24.9 |
| North Western | £21.8 |