What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 26 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | EDF Energy F01C | £66.77 |
| 2 | EDFE Aggregate S Eng 02 | £65.78 |
| 3 | Lakeside | £65.16 |
| 4 | Ocker Hill | £64.73 |
| 5 | Ilmer Lane | £59.29 |
| 6 | HawkersHill | £58.32 |
| 7 | Pillswood 2 | £53.35 |
| Region | £/MWh |
|---|---|
| Southern | £58.3 |
| Northern | £52.6 |
| Yorkshire | £51.8 |
| South Wales | £48.3 |
| Eastern | £43.5 |
| North Western | £41.5 |
| South Eastern | £37.3 |
| Midlands | £26.5 |
| South Western | £17.9 |