What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Nursling | £23.64 |
| 2 | Tye Lane | £22.71 |
| 3 | EDF Energy F01C | £21.18 |
| 4 | Native River | £19.57 |
| 5 | Pen y Cymoedd | £19.39 |
| 6 | HawkersHill | £19.12 |
| 7 | Sizing John | £18.62 |
| Region | £/MWh |
|---|---|
| Southern | £22.1 |
| Eastern | £21.5 |
| South Western | £19.6 |
| South Wales | £19.4 |
| Merseyside and North Wales | £18.5 |
| South Scotland | £18.4 |
| Yorkshire | £18.2 |