What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 31 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Jamesfield 1 | £22.39 |
| 2 | Pen y Cymoedd | £22.35 |
| 3 | Sizing John | £21.54 |
| 4 | Spalding | £18.97 |
| 5 | GridBeyond L02E | £18.34 |
| 6 | GridBeyond L08H | £18.34 |
| 7 | GridBeyond L0DN | £18.34 |
| Region | £/MWh |
|---|---|
| South Wales | £22.3 |
| North Scotland | £21.3 |
| Merseyside and North Wales | £16.4 |
| Northern | £16.4 |
| Yorkshire | £16.0 |
| South Scotland | £15.8 |
| Eastern | £15.3 |
| Southern | £13.3 |