What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 36 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Holes Bay | £26.22 |
| 2 | Seabank Module 2 | £23.13 |
| 3 | Ocker Hill | £18.64 |
| 4 | Lakeside | £18.63 |
| 5 | GridBeyond L02E | £17.75 |
| 6 | GridBeyond L08H | £17.75 |
| 7 | GridBeyond L0DN | £17.75 |
| Region | £/MWh |
|---|---|
| Southern | £26.2 |
| Midlands | £18.6 |
| Eastern | £14.3 |
| Northern | £13.7 |
| Yorkshire | £13.4 |
| Merseyside and North Wales | £13.1 |
| South Scotland | £13.0 |
| South Western | £12.6 |