What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 23 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Jamesfield 1 | £7.33 |
| 2 | Lakeside | £4.58 |
| 3 | Unit 2 | £4.46 |
| 4 | Broadditch | £4.33 |
| 5 | Nursling | £4.33 |
| 6 | Ocker Hill | £4.27 |
| 7 | Roaring Hill | £4.18 |
| Region | £/MWh |
|---|---|
| North Scotland | £7.3 |
| Yorkshire | £4.6 |
| South Eastern | £4.3 |
| Midlands | £4.3 |
| Southern | £4.2 |
| South Scotland | £4.2 |
| Eastern | £4.2 |
| South Western | £3.6 |