What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 48 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £20.00 |
| 2 | Seabank Module 2 | £17.56 |
| 3 | GridBeyond L0DN | £13.29 |
| 4 | Holes Bay | £12.84 |
| 5 | Statkraft Markets #4 | £11.76 |
| 6 | Enfield Centre Ltd BMU1 | £10.24 |
| 7 | EDFE Aggregate N Scot 1 | £10.22 |
| Region | £/MWh |
|---|---|
| Southern | £12.8 |
| Yorkshire | £9.8 |
| South Wales | £7.0 |
| North Western | £6.3 |