What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 53 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £9.38 |
| 2 | Seabank Module 2 | £8.47 |
| 3 | GridBeyond L0DN | £7.02 |
| 4 | Chapel Farm | £6.27 |
| 5 | ClayTye Farm 1 | £6.27 |
| Region | £/MWh |
|---|---|
| Eastern | £6.3 |