What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 48 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ClayTye Farm 2 | £40.81 |
| 2 | Didcot B main 5 | £32.50 |
| 3 | Peterhead Block 1 | £26.33 |
| 4 | Carnegie Road 1 | £24.86 |
| 5 | Port of Tyne | £24.33 |
| 6 | Unit 1 | £23.48 |
| 7 | F & S Energy #01 | £23.00 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £24.9 |
| Northern | £24.3 |
| Eastern | £23.5 |
| Southern | £22.8 |
| Midlands | £21.4 |
| Yorkshire | £21.4 |
| North Western | £20.8 |