What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 21 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £28.75 |
| 2 | Enfield Centre Ltd BMU1 | £23.02 |
| 3 | Jamesfield 1 | £20.27 |
| 4 | Unit 1 | £19.42 |
| 5 | Lakeside | £18.49 |
| 6 | Port of Tyne | £18.00 |
| 7 | HawkersHill | £17.00 |
| Region | £/MWh |
|---|---|
| North Scotland | £20.3 |
| Northern | £18.0 |
| Southern | £17.0 |
| Yorkshire | £15.1 |
| South Western | £11.5 |
| South Scotland | £11.0 |
| Merseyside and North Wales | £8.6 |
| Midlands | £8.4 |
| South Eastern | £7.8 |