What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 50 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Statkraft Markets #16 | £376.75 |
| 2 | Marchwood | £308.38 |
| 3 | Jamesfield 2 | £277.16 |
| 4 | Dollymans | £247.10 |
| 5 | Chapel Farm | £243.10 |
| 6 | Broadditch | £241.50 |
| 7 | Hunningley Stairfoot | £240.06 |
| Region | £/MWh |
|---|---|
| North Scotland | £277.2 |
| South Eastern | £241.5 |
| Eastern | £241.5 |
| South Scotland | £221.1 |
| Midlands | £203.2 |
| Yorkshire | £196.0 |
| Southern | £137.3 |