What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 33 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Marchwood | £16.91 |
| 2 | GridBeyond L02E | £14.68 |
| 3 | Rocksavage | £12.19 |
| 4 | SOUTH HUMBER BANK P/S | £11.00 |
| 5 | Flexitricity #08 | £10.57 |
| 6 | Shoreham | £10.49 |
| 7 | Spalding | £10.42 |
| Region | £/MWh |
|---|---|
| Yorkshire | £9.7 |
| Midlands | £9.3 |
| North Western | £8.3 |
| Eastern | £7.5 |
| Merseyside and North Wales | £6.7 |
| Southern | £5.6 |
| South Western | £5.4 |