What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 25 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Cottam Development Centre | £18.33 |
| 2 | Keadby-2 Main | £17.78 |
| 3 | Brigg | £17.23 |
| 4 | Centrica Business Solutions S06B | £16.59 |
| 5 | Native River | £12.43 |
| 6 | Drax | £11.17 |
| 7 | EDFE Aggregate N Scot 1 | £10.85 |
| Region | £/MWh |
|---|---|
| Yorkshire | £17.2 |
| South Western | £12.4 |
| Southern | £6.8 |