What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 35 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Shoreham | £24.10 |
| 2 | Cottam Development Centre | £20.17 |
| 3 | Farnham | £14.29 |
| 4 | Holes Bay | £14.17 |
| 5 | Dong Severn Ut 20 | £13.43 |
| 6 | SOUTH HUMBER BANK P/S | £9.88 |
| 7 | Lakeside | £9.60 |
| Region | £/MWh |
|---|---|
| Southern | £14.2 |
| Yorkshire | £9.6 |
| Midlands | £8.3 |
| South Eastern | £6.1 |
| Eastern | £5.6 |