What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Staythorpe 1 | £11.75 |
| 2 | Shoreham | £11.56 |
| 3 | Pillswood 1 | £8.88 |
| 4 | Lakeside | £8.71 |
| 5 | SOUTH HUMBER BANK P/S | £7.57 |
| 6 | F & S Energy #01 | £7.57 |
| 7 | Wormald Green | £7.57 |
| Region | £/MWh |
|---|---|
| Northern | £7.6 |
| South Wales | £7.3 |
| South Eastern | £6.5 |
| Yorkshire | £6.4 |
| North Western | £5.5 |
| Southern | £5.4 |
| Eastern | £5.1 |
| Midlands | £5.0 |
| Merseyside and North Wales | £4.4 |