What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 58 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £44.0 |
| Southern | £39.1 |
| Eastern | £38.8 |
| Yorkshire | £37.7 |
| North Western | £35.1 |
| Midlands | £34.2 |
| South Scotland | £31.3 |
| South Eastern | £30.5 |