What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Seabank Module 2 | £28.93 |
| 2 | Great Yarmouth | £24.54 |
| 3 | Centrica Business Solutions S05L | £21.61 |
| 4 | Spalding | £19.24 |
| 5 | Peterborough 3 | £19.18 |
| 6 | Ffestiniog | £17.72 |
| 7 | Rocksavage | £16.73 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £16.0 |
| Southern | £16.0 |
| Yorkshire | £15.8 |
| Midlands | £15.4 |
| Eastern | £14.6 |