What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Spalding | £33.64 |
| 2 | Carrington Ltd - 1 | £28.80 |
| 3 | Immingham CHP | £27.79 |
| 4 | Drax | £27.75 |
| 5 | Drax | £27.60 |
| 6 | Drax | £27.45 |
| 7 | Tye Lane | £22.55 |
| Region | £/MWh |
|---|---|
| Yorkshire | £21.3 |
| Eastern | £20.2 |
| Midlands | £16.0 |
| South Western | £16.0 |
| Southern | £15.6 |