What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #04 | £5.57 |
| 2 | Holes Bay | £5.31 |
| 3 | Skelmersdale | £5.16 |
| 4 | Tye Lane | £5.08 |
| 5 | Dollymans | £5.06 |
| 6 | Unit 1 | £5.06 |
| 7 | Ilmer Lane | £5.03 |
| Region | £/MWh |
|---|---|
| Southern | £4.8 |
| South Eastern | £4.7 |
| Merseyside and North Wales | £4.6 |
| Eastern | £4.4 |
| North Western | £3.2 |
| Yorkshire | £2.9 |
| South Western | £2.9 |
| Midlands | £2.5 |