What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 27 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Thame Road | £15.58 |
| 2 | Unit 1 | £14.84 |
| 3 | Bloxwich | £13.99 |
| 4 | Holes Bay | £13.76 |
| 5 | Limejump Energy #04 | £13.02 |
| 6 | Tye Lane | £12.24 |
| 7 | Pen y Cymoedd | £11.56 |
| Region | £/MWh |
|---|---|
| Southern | £13.8 |
| Eastern | £12.2 |
| South Wales | £11.6 |
| North Western | £10.6 |
| South Western | £10.4 |
| Midlands | £10.2 |
| Yorkshire | £10.0 |