What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 44 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Limejump Energy #04 | £15.83 |
| 2 | Richborough Park 1 | £15.00 |
| 3 | BESS Holdco 2 EN7H | £15.00 |
| 4 | Limejump Energy #05 | £14.93 |
| 5 | Richborough Park 2 | £14.86 |
| 6 | SOUTH HUMBER BANK P/S | £14.26 |
| 7 | Thame Road | £14.24 |
| Region | £/MWh |
|---|---|
| South Eastern | £14.9 |
| Southern | £13.9 |
| Eastern | £13.6 |
| Yorkshire | £12.5 |
| South Wales | £12.1 |