What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Farnham | £20.19 |
| 2 | Grain | £20.07 |
| 3 | Enfield Centre Ltd BMU1 | £20.06 |
| 4 | Limejump Energy #04 | £19.40 |
| 5 | Carnegie Road 1 | £16.75 |
| 6 | Brigg | £16.63 |
| 7 | SOUTH HUMBER BANK P/S | £16.25 |
| Region | £/MWh |
|---|---|
| Southern | £20.2 |
| Merseyside and North Wales | £16.8 |
| South Scotland | £14.7 |
| South Eastern | £13.7 |
| Eastern | £13.6 |
| South Wales | £13.4 |
| Yorkshire | £12.9 |
| Northern | £12.7 |
| Midlands | £12.3 |
| South Western | £10.2 |