What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 34 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Grain | £62.18 |
| 2 | Immingham CHP | £55.45 |
| 3 | Lakeside | £47.51 |
| 4 | Coryton | £47.50 |
| 5 | Ocker Hill | £46.38 |
| 6 | Dong Severn Ut 20 | £46.36 |
| 7 | Tye Lane | £44.29 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £43.6 |
| Eastern | £42.4 |
| Yorkshire | £42.1 |
| Midlands | £41.0 |
| Northern | £40.2 |
| South Wales | £38.9 |
| Southern | £38.5 |
| South Western | £37.5 |
| North Western | £32.8 |