What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 30 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ECOTRICITY C05L | £5.29 |
| 2 | Tye Lane | £4.29 |
| 3 | Carnegie Road 1 | £3.96 |
| 4 | Native River | £3.69 |
| 5 | SUNDON | £3.59 |
| 6 | Lakeside | £3.36 |
| 7 | Pivot Coventry | £3.27 |
| Region | £/MWh |
|---|---|
| Eastern | £4.1 |
| Merseyside and North Wales | £4.0 |
| South Western | £3.3 |
| Midlands | £3.3 |
| Yorkshire | £3.1 |
| Southern | £3.0 |
| North Western | £2.9 |
| South Eastern | £2.8 |