What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 42 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Contego | £13.00 |
| 2 | Chapel Farm | £13.00 |
| 3 | Farnham | £12.54 |
| 4 | HawkersHill | £12.54 |
| 5 | Holes Bay | £12.54 |
| 6 | Lakeside | £11.75 |
| 7 | Centrica Business Solutions S05L | £11.55 |
| Region | £/MWh |
|---|---|
| South Eastern | £13.0 |
| Southern | £12.5 |
| Yorkshire | £10.9 |
| Eastern | £9.3 |