What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 19 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Centrica Business Solutions S05L | £48.17 |
| 2 | Thame Road | £46.29 |
| 3 | Pillswood 1 | £43.55 |
| 4 | Contego | £40.47 |
| 5 | EDFE Aggregate S Eng 02 | £39.80 |
| 6 | Lakeside | £39.69 |
| 7 | Swangate | £39.41 |
| Region | £/MWh |
|---|---|
| South Western | £38.6 |
| Yorkshire | £38.4 |
| Midlands | £37.0 |
| Eastern | £35.7 |
| Southern | £33.2 |
| South Wales | £32.2 |
| South Eastern | £28.1 |
| North Western | £27.0 |