What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 17 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ClayTye Farm 1 | £6.42 |
| 2 | Cottam Development Centre | £5.73 |
| 3 | Unit 1 | £4.34 |
| 4 | Ilmer Lane | £2.86 |
| 5 | Limejump Energy #03 | £2.58 |
| 6 | Farnham | £2.44 |
| 7 | Pillswood 1 | £2.12 |
| Region | £/MWh |
|---|---|
| Eastern | £4.2 |
| Southern | £2.4 |
| Yorkshire | £2.1 |
| Midlands | £2.1 |
| Northern | £2.0 |
| South Western | £2.0 |
| South Scotland | £1.6 |