What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 16 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Contego | £27.17 |
| 2 | Ilmer Lane | £26.97 |
| 3 | Bloxwich | £26.00 |
| 4 | Hunningley Stairfoot | £24.42 |
| 5 | Burwell Weirs Drove | £24.42 |
| 6 | Statkraft Markets #16 | £22.24 |
| 7 | Lakeside | £21.90 |
| Region | £/MWh |
|---|---|
| Midlands | £21.8 |
| South Western | £19.3 |
| Eastern | £15.3 |
| Yorkshire | £13.9 |
| South Eastern | £13.3 |
| Southern | £11.6 |