What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 12 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | ClayTye Farm 1 | £7.11 |
| 2 | Keadby-2 Main | £7.01 |
| 3 | Zenobe Capenhurst #1 | £6.65 |
| 4 | SSE Energy Supply #01 | £6.14 |
| 5 | Wormald Green | £6.11 |
| 6 | Marchwood | £5.57 |
| 7 | Nursling | £4.95 |
| Region | £/MWh |
|---|---|
| Eastern | £7.1 |
| Merseyside and North Wales | £6.6 |
| Northern | £6.1 |
| Southern | £4.9 |
| South Eastern | £4.8 |