What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | SSE Energy Supply #01 | £8.72 |
| 2 | Zenobe Capenhurst #1 | £7.82 |
| 3 | Hawthorn Pit | £7.00 |
| 4 | ClayTye Farm 1 | £6.91 |
| 5 | Wormald Green | £6.38 |
| 6 | Broadditch | £6.23 |
| 7 | Keadby-2 Main | £5.51 |
| Region | £/MWh |
|---|---|
| Merseyside and North Wales | £7.8 |
| Eastern | £6.9 |
| Northern | £6.4 |
| South Eastern | £6.2 |
| Southern | £1.2 |