What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 11 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Wormald Green | £4.53 |
| 2 | EDFE Aggregate N Scot 1 | £4.29 |
| 3 | Larks Green | £3.13 |
| 4 | SSE Energy Supply #01 | £3.00 |
| 5 | ClayTye Farm 1 | £2.37 |
| 6 | Peterhead Block 1 | £1.72 |
| 7 | Nursling | £0.82 |
| Region | £/MWh |
|---|---|
| Northern | £4.5 |
| South Western | £3.1 |
| Eastern | £2.4 |
| Southern | £0.8 |