What was actually dispatched vs the merit order above. Shows accepted, skipped, and out-of-merit (favoured) units.
Excludes 6 accepted units with <1 MWh volume
Units with MZT/MNZT/NDZ ≥31 minutes (and not running) and volumes outside SEL-MEL/SIL-MIL ranges. What remains are unexplained skips.
# | Unit | £/MWh |
|---|---|---|
| 1 | Didcot B main 5 | £16.38 |
| 2 | SSE Energy Supply #01 | £13.15 |
| 3 | Pembroke 11 | £11.77 |
| 4 | Pembroke 21 | £11.75 |
| 5 | Marchwood | £10.00 |
| 6 | Lakeside | £8.16 |
| 7 | SOUTH HUMBER BANK P/S | £8.16 |
| Region | £/MWh |
|---|---|
| Yorkshire | £8.2 |
| Midlands | £7.1 |
| Northern | £6.9 |
| South Western | £6.2 |
| South Wales | £5.7 |